Services Offered
  • Transport Demand Forecasting
  • Facility Requirement Development
  • Airspace Analysis and Planning
  • Surface Movement Analysis
  • Site Selection Study
  • Environmental Impact Study
  • Cost-Benefit Analysis
  • Feasibility Studies
  • Conceptual and Master Planning
  • Design Criteria Development
  • Preliminary Design
  • Detailed Design
  • Cost Estimate
  • Design Management/Control
  • Budget/Schedule Planning
  • Bid Documentation
  • Bid Evaluation and Assistance
  • Construction Planning
  • Shop Drawing Coordination
  • Construction Management
  • Construction Supervision
  • Construction Inspection and Acceptance
  • Cost/Schedule/Quality Control
  • System Planning
  • Tenant Space Planning
  • Personnel Training
  • Operational Cost Analysis
  • Lease Management Planning
  • Property Control Systems
  • Operation and Maintenance Manuals
  • Diagnosis of Total Airport Systems
  • Airport Capacity Improvement Plan
  • Airport Marketing Program
  • Airport Maintenance Program
  • Equipment Procurement Assistance
Projects
  • REPAIR AND UPGRADING OF NAIA RUNWAY 13/31 AND CONTRUCTION OF NEW STUB TAXIWAY FOX-3 (2004-2008)
  • REPAIR AND UPGRADING OF NAIA RUNWAY 13/31 (INTERCONNECTION OF TAXIWAY P AND TAXIWAY F-3) (2003)
  • PRE-FEASIBILITY STUDY FOR THE DEVELOPMENT OF CATICLAN AIRPORT (2003)
  • REVIEW OF 1999 MASTER PLAN AND FEASIBILITY STUDY DIOSDADO MACAPAGAL INTERNATIONAL AIRPORT DEVELOPMENT PROJECT (2003)
  • DETAILED DESIGN FOR TAN SON NHAT INTERNATIONAL AIRPORT TERMINAL CONSTRUCTION PROJECT (2002-2003)
  • OVERLAY OF NAIA RUNWAY 06/24 AND REPAIR AND UPGRADING OF NAIA TAXIWAY 06/24 (2001-2003)
  • NEW LEGASPI AIRPORT DEVELOPMENT PROJECT (2002)
  • NEW ILOILO AIRPORT DEVELOPMENT PROJECT (2001-2008)
  • NAIA FUEL FARM RELOCATION PROJECT (2001-2003)
  • AIR CARGO HUB DEVELOPMENT STUDY FOR THE CLARK INTERNATIONAL AIRPORT (2000)
  • ADVANCE ENGINEERING STUDY FOR THE NEW ILOILO AIRPORT DEVELOPMENT PROJECT (2000)
  • ENVIRONMENTAL IMPACT ASSESSMENT (EIA) STUDY FOR THE NEW ILOILO AIRPORT DEVELOPMENT PROJECT (1999)
  • CLARK INTERNATIONAL AIRPORT DEVELOPMENT PROJECT (1999)
  • VERIFICATION OF OPERATIONAL RESTRICTIONS AND RENEWAL OF AERODROME DRAWINGS AT NAIA (1998)
  • NATIONWIDE AIR NAVIGATION FACILITIES MODERNIZATION PROJECT PHASE III (1997-2004)
  • QUALITY ASSURANCE SERVICES FOR THE NAIA PASSENGER TERMINAL 3 DEVELOPMENT PROJECT (1997-2003)
  • AVIATION SUPPORT INDUSTRIAL AREA (ASIA) SITE DEVELOPMENT PROJECT (1996-1997)
  • BALAGBAG APRON DEVELOPMENT PROJECT (1996)
  • MACTAN (CEBU) INTERNATIONAL AIRPORT DEVELOPMENT PROJECT (1996-1997)
  • NAIA TERMINAL 2 DEVELOPMENT PROJECT (1994-2000)
  • PLANNING, DESIGN AND CONSTRUCTION SUPERVISION OF NAIA RUNWAY 06/24 EXTENSION, OVERLAY AND RAPID EXIT TAXIWAYS PROJECT (1993-1994/1997)