The Project involved the development of a second passenger terminal to cater mainly to the increasing volume of domestic air passenger traffic and some international traffic as well at the Ninoy Aquino International Airport. The Project also involves resurfacing of apron, construction of additional apron, taxiways, access road system, car parks as well as sewage treatment plant. Initial engineering services involving the review of previous master plan, preparation of preliminary and detailed design, and the preparation of bid documents were earlier concluded by another consulting firm commissioned by the Philippine government.
PHIL.JAC was contracted to conduct additional environmental studies and design works for a new sewage treatment plant and a fuel hydrant system. In addition, PHIL.JAC provided supervisory engineering services during the pre-construction and construction phases of the Project.